0%
NeoBuild

Project and Construction Management

We monitor and coordinate all construction phases to ensure deliveries according to plan.

Schedule Control

Constant monitoring of planning to ensure deliveries within the established timeframe.

Resource Management

Optimization of materials, labor, and equipment for maximum efficiency and economy.

Quality Control

Rigorous inspections and quality checklists at each phase of project execution.

Professional management that eliminates unforeseen issues and ensures superior results.

REQUEST A QUOTE
Project and Construction Management
Managed Project

Olympia Shopping Mall

Delivered 15% ahead of schedule

45+ Managed Projects
98% On-Time Deliveries
15% Average Cost Savings

Our Advantages

That make a difference in your project!

Remodeling Icon

Efficient Schedule Control

We develop and manage detailed schedules, ensuring that each phase of the project is completed within the established timeframe.
Construction Icon

Precise Cost Management

We rigorously control the budget to avoid financial surprises, providing total transparency at each stage of the project.
Construction Icon

Rigorous Quality Control

We implement continuous verification processes to ensure that all work meets the highest quality standards.

Management Phases

Our complete process for your project's success

Phase 01

Planning

We create a detailed plan with schedule, budget, and definition of resources needed for the project.

Phase 02

Controlled Execution

We coordinate all teams and suppliers, ensuring the correct execution of each step as planned.

Phase 03

Monitoring

We monitor the construction progress daily, verifying compliance with projects and quality standards.

Phase 04

Risk Management

We identify and mitigate potential risks before they become problems, ensuring continuous progress of the construction.

Phase 05

Change Control

We manage project changes in an organized manner, evaluating impacts on deadlines and costs.

Phase 06

Final Delivery

We complete the project delivery with all necessary documentation and guarantee of total client satisfaction.

The management phases occur in an integrated manner, with continuous interactions to ensure quality and efficiency throughout the project lifecycle.

Frequently Asked Questions

Answers to the most common questions about our management service

How long does a management project typically take?

The time varies according to the complexity and size of the project. Smaller residential projects can take 3 to 6 months, while commercial or larger projects can extend from 8 to 18 months. During the initial consultation, we create a personalized schedule for your specific case.

How does the budgeting process work for construction management?

Our budget is customized and considers factors such as: construction size, project complexity, estimated duration, and level of detail required. After a free initial analysis, we present a detailed commercial proposal with all included services and payment terms.

What documents are needed to start management?

To begin, we need architectural plans, complementary projects (structural, electrical, plumbing), existing permits and licenses, and property/land documentation. If you don't have all these documents, we can assist in obtaining them as part of our services.

How is monitoring done during construction?

We conduct regular technical visits to the construction site, with frequency determined according to the project's complexity. We provide weekly reports with photos, measurements, and compliance analyses. Additionally, we maintain constant communication via messaging apps and periodic meetings for alignment.

Do you work with residential and commercial projects?

Yes, we serve residential, commercial, industrial, and institutional projects. Our team has diverse experience and is prepared to manage construction of different sizes and purposes, always with the same standard of quality and attention to detail.

With vs Without Professional Management

Understand the difference professional management can make in your project

With NeoBuild Management

Without Professional Management

Execution Time

Controlled schedule with constant monitoring and preventive adjustments

Frequent delays due to lack of planning and coordination between teams

Cost Control

Budget respected with rigorous control and transparency in expenses

Budget overruns of up to 30% due to rework and poor resource management

Final Quality

Superior standard with constant verifications and immediate corrections

Frequent problems and inconsistent finishes due to lack of supervision

Documentation

Complete and organized, facilitating future maintenance and warranties

Incomplete or nonexistent, creating future problems with maintenance

Problem Solving

Anticipation and prevention of problems before they occur

Reactive resolution after problems arise, generating delays and costs

Client Stress

Minimized with clear communication and professional management

Elevated due to the need for constant problem resolution

Don't risk your project's success. Count on NeoBuild's experience for professional management.

REQUEST A QUOTE

Estimate Calculator

Get an initial estimate for your project management

Basic Information

Details and Specifications

Special Requirements

Estimate Results

General Information

Approximate duration: -
Estimated technical visits: -
Investment range: -
Estimated labor: -

Materials Estimate

Cement (bags): -
Sand (cubic yards): -
Bricks (units): -
Steel (lbs): -

Impact and Consumption

Estimated water consumption: -
Estimated energy consumption: -
Estimated carbon footprint: -

*This is only a preliminary estimate. For an accurate budget, please contact us.

Request Detailed Budget

Ready to start your project with safety and peace of mind?

Contact us and discover how our management service can ensure the success of your venture.

REQUEST PROPOSAL